How can I create a Work Log associated with a Contract
  • 16 Apr 2024
  • 1 Minute to read
  • Dark
    Light
  • PDF

How can I create a Work Log associated with a Contract

  • Dark
    Light
  • PDF

Article summary

In order to perform Subminimum Wage Time Study Tests, users must have the appropriate privileges. Thes privileges provide access to the Work Log page and its associated entity rights.

You must first choose a client before you can add a new work log entry.

image.png

You can then fill in the details of the work that was performed and for which contract/work type.

The job coach automatically updates to the client's program case manager based on which contract is chosen. The lunch minutes also updates to the default set on the contract (see below). In the work type dropdown, you can also choose work types that are marked as not "used on contracts" in the work type library. For a real-world use case, these will be things like "out sick", "on vacation", etc.

image.png

On contracts, you can set the default number of lunch minutes that fills in the work log. All contracts default to 30 minutes of lunch time.

image.png

Note:

If you can't see the contract or work type, check to see if the contract has the appropriate Deliverable Type in the Edit Contract screen.


Was this article helpful?